Levegő-levegő rakéták

The Diamondback was a proposed nuclear-armed air-to-air missile studied by the United States Navy's Naval Ordnance Test Station during the 1950s...
With a liquid-fueled motor and dual-mode guidance system, the Diamondback was an early effort to make a longer-range missile based on the Sidewinder.
To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.
 
US Air Force Looking For Cheap Air-To-Air Missile Half The Size Of AMRAAM...

The Air Force is eyeing a pint-sized, extended-range, low-cost missile to arm Collaborative Combat Aircraft and crewed fighters.
 
Túl sok variációs lehetőség nincs, például nincs sok értelme a levegőbeömlő csövet a menetirányra merőlegesen elhelyezni...

Egyrészt igen, másrészt - bár elég nehéz rendese képeket találni - mintha első ránézésre teljes lenne az egyezés. A ramjetnek ugyanúgy kettős beömlő nyílásaik vannak, ugyanolyan formában. ÉS bár mintha különböző variánsok lennének a szárnyvégek kapcsán, de mintha az is egyezne.
 
The DGA carries out the first development firing of a Mica NG missile from a Rafale aircraft
 
  • Tetszik
Reactions: fishbed
The DGA carries out the first development firing of a Mica NG missile from a Rafale aircraft
  • Long range capability: up to +40% with MICA NG compared to MICA
  • High maneuvrability with dual pulse motor
  • Interoperability MICA/MICA NG
  • MICA NG missile provides a dual use (air and surface launch)
  • IR seeker providing IRSTS capability to pilot
 
  • Tetszik
Reactions: endre and fishbed

Denel to deliver first production A-Darter missiles to the SAAF this month

Denel Dynamics is due to deliver the first operational A-Darter fifth generation air-to-air missiles to the South African Air Force (SAAF) this month, after years of delays.

Denel stated that eight inert practice missiles have already been delivered to the SAAF, along with four acquisition trainer missiles (out of an order for 21). The first four operational A-Darters are scheduled for delivery this month, with 37 more to follow.

Deliveries are under Project Kamas, the industrialisation phase that followed A-Darter development under Project Assegaai. A three-year delay in the completion of development led to extended Project Kamas delays, Denel explained, with liquidity challenges resulting in the loss of key skills and subsequent delays.
 
  • Tetszik
Reactions: fishbed and endre
Sparrow története

To view this content we will need your consent to set third party cookies.
For more detailed information, see our cookies page.
 
  • Tetszik
Reactions: fishbed