V-280 Valor (Bell, USA) / MV-75

FLRAA achieves Milestone B, enters next phase of development...

The Milestone B allows the Army to exercise the first option which includes detailed aircraft design and build of six prototype aircraft. The Army is planning for the first FLRAA flight in 2026 with low-rate initial production scheduled to begin in 2028 and initial fielding activity in 2030. The Army will continue to review and refine the schedule as necessary based on the contract award and the latest program activities.



Army’s long-range tiltrotor aircraft moves to next development phase...

The Army will now equip the first unit with the capability in fiscal 2031.

 
  • Tetszik
Reactions: fishbed
Bell Demonstrates Future Long Range Assault Aircraft (FLRAA) Virtual Prototype to U.S. Army...


Army Accepts First MV-75 FLRAA Virtual Prototype
 
First MV-75 Display at Army's 250th Celebration

599227-image-becb08-large-1751053713.png