Mindkettőhöz a rakétákon felül tartozik egy kieg. csomag is.Korában hivatalos dokumentumot linkeltem a magyar jóváhagyásokról, amiből kiderül hogy
a 230 millió USD-ből a 60 db ER rakéta az 190 millió USD
a 500 millió USD-ből a 180 db C7/C8 320 millió USD
azaz Magyarországnak
ER: 3,17 millió USD/db
C7/C8: 1,78 millió USD/db
Ha csak a rakéták darabárát nézzük. De kell mellé még sok minden hogy tárolni, ellenőrizni, használni lehessen.
The Government of Hungary has requested to buy one hundred and eighty (180) AIM-120C-7 Advanced Medium Range Air-to-Air Missiles (AMRAAM), and four (4) spare AIM-120C-7 AMRAAM guidance sections. Also included are four (4) spare AIM-120C-7 control sections, six (6) AMRAAM training missiles (CATM-120C), missile containers, classified software (for the AN/MPQ-64F1 Sentinel Radar requested by Hungary through Direct Commercial Sale), spare and repair parts, cryptographic and communication security devices, precision navigation equipment, other software, site surveys, weapons system equipment and computer software support, publications and technical documentation, common munitions and test equipment, repair and return services and equipment, personnel training and training equipment, integration support and test equipment, and U.S. Government and contractor, engineering, technical and logistics support services, and other related elements of logistical and program support. The total estimated cost is $500 million.
The Government of Hungary has requested to buy sixty (60) AIM-120C-7/C-8 AMRAAMER missiles, and two (2) spare AIM-120C-7/C-8 AMRAAM-ER guidance sections. Also included are four (4) AMRAAM-ER training missiles (CATM-120C); missile containers; spare and repair parts; cryptographic and communication security devices; precision navigation equipment; software, site surveys; weapons system equipment and computer software support; publications and technical documentation; common munitions and test equipment; repair and return services and equipment; personnel training and training equipment; integration support and test equipment; and U.S. Government and contractor, engineering, technical and logistics support services; and other related elements of logistical and program support. The total estimated cost is $230 million.